Installation work should follow the installation drawings, manual, and test conditions for the specific model, with attention to the following:
1. Verify that the cutout dimensions, panel flatness, and mounting frame meet the specifications.
2. Verify that the waterproof gaskets, sealing strips, or front bezel contact surfaces are intact, with no twisting, damage, or trapped foreign objects.
3. Tighten the mounting screws as specified. Avoid leaving screws too loose, which can allow water ingress, or overtightening them, which can deform the seals.
4. Verify that the power, signal, and I/O connectors are fully seated, and use compatible military-standard or waterproof connectors.
5. Seal cable exits, cable glands, and unused openings according to the product specifications.
6. After repairs, disassembly and reassembly, or touch glass replacement, recheck the seals. Do not assume that the original IP protection is automatically maintained after repairs.
7. When cleaning, avoid using high-pressure water jets directly on the product, and do not spray cleaning solutions directly toward panel edges, connectors, or ventilation areas.
ELGENS has integrated hardware, mechanical, and thermal design capabilities and also performs pre-shipment assembly and quality inspections. For specialized military or maritime projects, post-installation protection conditions can also be confirmed during the quotation and testing stages.